Back to Top

Hi, Guest!

  LOKASI :  Kota Administrasi Jakarta Timur

Bergabung Selama :

BAGIKAN :   

Bagikan :
  • AUMA

AUMA

Update Terakhir
:
10 / 12 / 2019
Min. Pembelian
:
0
Dilihat Sebanyak
:
54 kali

Harga

CALL
Bagikan
:

Perhatian !

Perusahaan ini terdaftar sebagai Free Member. Hindari melakukan pembayaran sebelum bertemu penjual atau melihat barang secara langsung. COD (Cash On Delivery) atau bertemu langsung dengan penjual merupakan metode transaksi aman yang kami sarankan.

Detail AUMA

For the first time AUMA is present with its products at an exhibition in Germany: The appearance of AUMA at the ACHEMA 1979 at Frankfurt is a big success. Who would have guessed back then that 15 years later AUMA would participate annually at more than 20 exhibitions worldwide? No actuators without gearings. Valve gearboxes are not in the limelight but nonetheless they are indispensable. Applications with special requirements or difficult mounting positions can only be automated by suitable gearbox versions whether be it to increase the torque, to transform from rotation to swivel movement or to reverse the drive shaft. In this year the worm gearbox of the range GS 32 – GS 125 replaced the range GS 00 – GS 7, which had been built since 1967. 1980 200 employees - a commitment, too. AUMA employs 200 people in its German plants. This is a great success in times of economic difficulties, resulting from a wider customer base. In the meantime AUMA products can be found in large industrial plants of all types – from steel mills to sugar refineries to paper mills. Worldwide demand for AUMA products guaranteed stability for the following years. 1983 The other type of the actuator. A new range of part-turn actuators designated as the SG 05 – SG 12 is developed. The reason for this new development is to offer part-turn actuators compact and economical. Up to now small part-turn valves had to be automated with combinations of multi-turn actuators and worm gearboxes. 1985 High rising AUMA invests not only in research and engineering, but in efficient logistics. A modern and fully automated high storage inventory system for individual parts, ready mounted modules and sub-assemblies is built at Muellheim. According to individual requirements, actuators can be assembled quickly making use of this stock. At the same time an assembly shop with an area of over 600 m² is erected. In the desert Near Abu Dhabi in the United Arabian Emiriates one of the worlds largest power plants and desalination plants is built – Al Taweelah. More than 800 AUMA actuators are required for the power plant sector. In 1993 the conclusion of the project Al Taweelah B follows. Six gas fired power plant blocks with connecting desalination plants produce 14, 5 million kWh electricity and 360 000 cubic meter fresh water per day. More than 3 000 AUMA actuators are responsible for trouble-free operation. 1986 Quick reaction. Networkable. Requested worldwide. Long distances mean long response times. The newly designed programmable motor controls AUMA MATIC are directly attached to the new multi-turn actuators SA 07.1 – SA 16.1. The actuator not only reacts quickly to the commands but is very flexible and can easily be integrated into the process control system or field bus system. Modern electronics offer possibilities which one would not have dreamed of a few years ago! Functions which before had to be integrated extensively into the centralized control station are now taken over by integral actuator controls. On expansion. AUMA Germany hires the three hundredth employee. Additionally sales force in Germany is expanded. Service for customers. A new and large service center is established in cologne for commissioning, maintenance and service. Here customer service is organized throughout Germany. 1988 Plant II A adjacent facility of 2 800 square meters with production and administration buildings is bought on line in Muellheim. Total space is now approx. 7 600 square meters. 1989 At AUMA you can learn a lot. Where research and engineering is of importance, training and education is common. Where education takes place, you can build a career. Apprenticeship is offered for industrial clerks. In 1990 an apprentice workshop is established for training industrial mechanics and manufacturing mechanics. 1990 On the seven seas Ships are to a certain extent independent systems. Actuators play an important role in these systems. Due to their compact size and their low weight AUMA part-turn actuators SG 04.2 – SG 10.2 are the first electric valve actuators which succeeded in seafaring. ... and through the dessert But even, where water is precious, AUMA actuators are in use ? e.g. at the Riyadh Water Transmission Pipeline from the desalination plant in Al Jubayl to Riyadh on the Arabian peninsula. With the support of 6 pumping stations 350 000 m³ water is transported daily over 466 km through two pipelines, each with a diameter of 1 500 mm. AUMA has become established worldwide in its tradtional domain, the water and waste water industry. 1992 400 employees. Continued growth. The four hundredth employee in Germany is hired. The ‘ garage company’ has developed in less than 30 years to a considerable medium-sized company. 1993 AUMA restructures internally and externally. In 1993 not only is the type of company changed from a Limited Partnership to a Limited Partnership with Limited Company as General Partner, but externally something is being done: new office buildings and a container hall at Muellheim, total renovation of the apprentices’ workshop and new motor production at Nellingen. Last but not least, a new AUMA Service Center is established in Magdeburg. It was developed from the Magdeburger Valve Company. Its main focus is on the subsequent modernization and automation of sluice valve and controlling devices in old plants with new actuators. Whatever is going on in and around AUMA can now be found in the company magazine ‘ AUMA aktuell’ , especially issued for employees. Electricity for Indonesia. The graving economy and the rising standard of living of the ‘ Tiger States’ increased the need for electric energy. Therefore it is not surprising that in this part of the world there are a number of power plant projects. One example: Paiton I and II in Indonesia, a gas and steam power plant with 2 x 400 MW power. AUMA supplies the actuators with integral controls. Also in 1997/ 98 for two new blocks, each with 610 MW power, are equipped with approx. 170 AUMA multi-turn actuators with integral controls. 1994 New technologies - new actuators. Especially worth mentioning are the new part-turn actuators AS 3 – AS 50. This range is distinguished by a high total efficiency and in the version ASR by excellent control features. Convincing quality - The year of the innovations. All AUMA locations in Germany are certified according to ISO 9001, because quality is the key to our success. Several new actuator ranges are started according to this high level of quality. 1995 To create and preserve values. Actuators often operate under difficult conditions. Heat, cold, water and aggressive media affect the components and housing. High quality corrosion protection and the high class of enclosure provide trouble-free operation and long lifetime for AUMA actuators. This is an investment that is worthwhile. 1996 Strong teams. To work on the assembly line? Not at AUMA. Small groups at partner work places take over the assembly jobs including quality control and therefore assume responsibility for their work. Together with the Fraunhofer Institut for work organization ( FAO) , the work places are designed in a way that increase both product quality and productivity. 1998 To be flexible and remain flexible. Fixed working hours, but quick reaction according to the order situation? That does not fit together. Flexible working hours in manufacturing and administration enable timely handling of customer orders and quotations. A large flexible time frame does not only offer more independence for employees but it also makes production active and mobile, as todays’ market demands. 2002 New part-turn actuators. “ To design a small, lightweight and inexpensive electric actuator for the automation of small OPEN-CLOSE part-turn valves with low torque requirement, but which meets the high AUMA standards” , this was the task given to the AUMA design engineers. The result are the part-turn actuators SG 03.3 and SG 04.3, which extend the torque range of the reliable part-turn actuator types SG 05.1 - SG 12.1 to the lower torques. Due to consistent lightweight design and the use of a compact, by AUMA patented gear technology the guidelines could be fulfilled. 2004 Plant III AUMA celebrates 40 years trading with growth from two to 1, 300 employees and actuator sales increase in a similar proportion. A new production facility was built at Muellheim in 2004 and offers 4, 800 additional square metres of production space. On 2004 also the solar roof on the new plant III was officially commissioned. AUMA now has one of the largest photovoltaic plants in the Freiburg region. The roof space amounts to more than 1, 500 sq metres and boasts more than 1, 000 solar panels. It is expected to generate 156, 750 units ( kWh) of clean PV electricity. AUMA presents itself as modern, environmentally friendly company. 2006 AUMA experiences sustained growth and has a street named after the company AUMA keeps on growing. 1, 500 employees worldwide need more space. In Muellheim, plant I has been completely refurbished and expanded by a new dispatch area which can be directly accessed and passed through by trucks. And an old promise has been kept: AUMA gets their own street named after the company. Both managing directors, both company founders and the mayor ( left to right) inaugurate the " Aumastraß e" . 2007 Powder coating instead of wet paint Improved environmental performance and corrosion protection: AUMA introduces powder coating. After comprehensive testing, the first series part passes through the extensive powder coating facility at the beginning of 2007. T-shirt imprint: " Yes, it works! " 2008 Federal cross of merit for company founders For their achievements as entrepreneurs, the company founders Werner Riester and Rudolf Dinse were awarded the Federal Cross of Merit. What started as a two-person garage company in the 1960s has now become an organisation with 1, 700 employees worldwide. 2009 Generation .2 AUMA actuators and actuator controls are widely used in process plants throughout the world. Their highly developed technology and proven reliability guarantee accurate long term performance in a wide variety of applications. In 2009, AUMA introduces with the Generation .2 actuators and controls a significant further development for the increasing demands in all types of process plants, from the water industry and energy sector to the oil and gas industry. 2012 SQ .2 part-turn actuators A multi-layer modular concept is the AUMA way to meet the multitude of requirements for automating industrial valves. SQ .2 part-turn actuators With the launch of the new SQ .2 part-turn actuator type range, this concept was even refined. Whereas the predecessor SG was an own design, the new SQ .2 part-turn actuators are based on the identical technical platform as the SA .2 multi-turn actuators, introduced two years ago..
Tampilkan Lebih Banyak